Installation, Assembly & Deployment

Installing the SUBflex System is executed by highly experienced professional team of divers and port staff, supervised by SUBflex’ Field Operations Manager, and concurrent with the client’s specific requirements.

The Installation is divided into two stages. The first stage is the Deployment of the frame, cages, lateral pipes and nets across the open port. The second stage is the Assembly of the system in both land and maritime environments, followed by final adjustments at sea. The dedicated skilled SUBflex personnel lead the entire operation of assembling the system, mooring the anchor unit, towing the assembled system off-shore and deploying it on-site by connecting both units offshore.